AGT-110 Gas Turbine

AGT-110 Gas Turbine

● Major development project of the national "863" plan during the 10th and 11th five-year Plan period. 

● Advantages of rapid start-up, high comprehensive thermal efficiency, easy to maintenance and so on. 

● Widely used in ship power, cogeneration, natural gas peak regulation power station and other fields.

| Perfomance Data

In ISO condition, nature gas as the fuel, the performance data of the gas turbine are as follows:(The performance parameter stamp is valid)

Item

PT Speed

Heat Rate

Exhaust Temperature

Exhaust Mass Flow

Unit

kW

%

kg/s

Performance Index

114500

36

517

362

| Perfomance Data

In ISO condition, nature gas as the fuel, the performance data of the gas turbine are as follows:

(The performance parameter stamp is valid)

Item

PT Speed

Heat Rate

Exhaust Temperature

Exhaust Mass Flow

Unit

kW

%

kg/s

Performance Index

114500

36

517

362

 
 
 

| Fuel

● Nature Gas、Diesel、Low and Medium Calorific Value Fuel

| Power Generator Layout

| Size And Weight

● Gas Turbine Size: 7233mm(Total length),2970mm(Gas turbine inlet diameter),

                     3100mm(Gas turbine outlet diameter),3700mm(The maximum diameter)

● Gas Turbine Weight:100000Kg(Including base)

AGT-110 CNOOC ShenZhen Innovation Development Project

 

The AGT-110 demonstration project began to establish a test platform in April 2012, and the gas turbine was transported to CNOOC Shenzhen Electric Power Co., Ltd., and the 72-hour simple cycle continuous operation test evaluation of the gas turbine was achieved in December of that year; the unit completed 168 in November 2013 Hourly combined cycle test test assessment; in 2014, the unit's 1000-hour industrial operation assessment was completed. In 2014, a low-emission retrofit project for the unit was started. In August 2015, the AGT-110 heavy-duty gas turbine with a low-emission combustion chamber was commissioned at CNOOC Shenzhen Power. CNOOC Shenzhen Deep Power has accumulated more than 1,600 hours of full-load operation. Since the unit is the first test unit, there are many test projects and the equivalent life has reached more than 6000 hours.

We could not find any corresponding parameters, please add them to the properties table

About  |  Product  |  Service  |  Advantages  |  News  |  Contact Us

ADD:17th Floor, Block H, Innovation World, No.109 Quanyun Road, Shenyang District, China (Liaoning) Free Trade Zone   Tel:400-666-4828   

辽ICP备20004551号-1 300.cn  Beijing