Unit Assembly Installation and Commissioning
We have rich experience in complete sets of various types of units at home and abroad, and we can tailor personalized solutions for enterprises according to the needs of enterprises. From package design, component procurement, to unit installation and debugging, we provide you with one-stop service and turnkey projects Your first choice of service experts.





Unit Assemble
1、Core Engine Assembly Case
Domestic
Oversea
AGT-2、AGT-7、AGT-12、AGT-15、AGT-25、AGT-110、WP6G、AGT-1/AGT-1H、AGT-3/AGT-3H、
QDR50、QD50、QDR54(SGT100) 、QDR70(SGT200)QDR79(SGT300)、QDR129(SGT400) 、QDR330(SGT700)、QD100、QD160
2、Case

AGT-7B CNOO HaiNan Dong Fang Terminal

AGT-15 TianJin Steel Pipe Group Distributed Energy

AGT-25 大唐江苏发电项目

AGT-110 CNOOC ShenZhen Innovation Development Project

AGT-12 DaQing Oil Field BeiYa AGT-12 Gas Turbine Project

AGT-2 上海老港工业园10MW天然气分布式能源项目

Installation and Commissioning
Since 1980s, over 100 gas turbine units have been installed, commissioned or relocated in China by us. Those units included the models of GE10、MS5001B、MS6001B、MS9001E、LM2500、LM5000、6F.01、FT8、Centaur40、Taurus70、Mars100、Titan130、SGT200、SGT300、SGT400、SGT700、M251S、H25、GT13D、GT13E2, which were manufactured by GE, Pratt & Whitney, Solar, Siemens, Mitsubishi, Hitachi, Alstom respectively, and the models of AGT-2、AGT-7、AGT-12、AGT-15、AGT-25、AGT-30、AGT-110, which were manufactured by our corporation. Now we own many professional teams with high technologies, skills and experiences in gas turbine engineering, project construction, operation and maintences. We also have one complete set of quality, healthy, safety and environmental protection assurance system and we have good reputation in gas turbine industry.
So far, what we have completed gas turbine projects were, PAKISTAN UCH POWER PLANT with three PG9171E gas turbines, BANGLADESH TONGI POWER STATION with two PG9171E gas turbines, SOYO POWER STATION in Angola with three MS9001E gas turbines and Thyton, Myanmar power station with two 6F .01 gas turbine. With rich overseas operation and maintenance experiences, we can also provide one-stop power station operation technical services, to meet the requirements and to create the greater values for different owners from different contries.
1、Core Engine Installation and Commissioning Case
Domestic
Oversea
AGT-2、AGT-7、AGT-12、AGT-15、AGT-25、AGT-110、WP6G、AGT-1/AGT-1H、AGT-3/AGT-3H、
QDR50、QD50、QDR54(SGT100) 、QDR70(SGT200)QDR79(SGT300)、QDR129(SGT400) 、QDR330(SGT700)、QD100、QD160
2、Case--Domestic

Installation and Commissioning of AGT-2 gas turbine at Xifeng Power Plant in Changqing Oilfield

Installation and commissioning of MS9001E gas turbine in Longwan,

Installation and commissioning of Clarion Centaur40 gas turbine in Tarim Oilfield

Installation and commissioning of Mars100 gas turbine in Xinjiang Lunnan Power Plant

SGT400 installation and commissioning in Guangzhou Aotou Distributed Energy Station

SGT300 installation and commissioning in Shanghai Dongguan Paper Co. Distributed Energy Station
3、Case--Oversea

Thyton Myanmar 6T.01 gas turbine power station installation and commissioning

Installation and commissioning of MS9001E gas turbine at SOYO power station in Angola

Installation and commissioning of PG9171E gas turbine at UCH power station in Pakistan

Unit Assemble
1、Core Engine Assembly Case
Domestic
Oversea
AGT-2、AGT-7、AGT-12、AGT-15、AGT-25、AGT-110、WP6G、AGT-1/AGT-1H、AGT-3/AGT-3H、
QDR50、QD50、QDR54(SGT100) 、QDR70(SGT200)QDR79(SGT300)、QDR129(SGT400) 、QDR330(SGT700)、QD100、QD160
2、Case

Installation and Commissioning
Since 1980s, over 100 gas turbine units have been installed, commissioned or relocated in China by us. Those units included the models of GE10、MS5001B、MS6001B、MS9001E、LM2500、LM5000、6F.01、FT8、Centaur40、Taurus70、Mars100、Titan130、SGT200、SGT300、SGT400、SGT700、M251S、H25、GT13D、GT13E2, which were manufactured by GE, Pratt & Whitney, Solar, Siemens, Mitsubishi, Hitachi, Alstom respectively, and the models of AGT-2、AGT-7、AGT-12、AGT-15、AGT-25、AGT-30、AGT-110, which were manufactured by our corporation. Now we own many professional teams with high technologies, skills and experiences in gas turbine engineering, project construction, operation and maintences. We also have one complete set of quality, healthy, safety and environmental protection assurance system and we have good reputation in gas turbine industry.
So far, what we have completed gas turbine projects were, PAKISTAN UCH POWER PLANT with three PG9171E gas turbines, BANGLADESH TONGI POWER STATION with two PG9171E gas turbines, SOYO POWER STATION in Angola with three MS9001E gas turbines and Thyton, Myanmar power station with two 6F .01 gas turbine. With rich overseas operation and maintenance experiences, we can also provide one-stop power station operation technical services, to meet the requirements and to create the greater values for different owners from different contries.
1、Core Engine Installation and Commissioning Case
Domestic
Oversea
AGT-2、AGT-7、AGT-12、AGT-15、AGT-25、AGT-110、WP6G、AGT-1/AGT-1H、AGT-3/AGT-3H、
QDR50、QD50、QDR54(SGT100) 、QDR70(SGT200)QDR79(SGT300)、QDR129(SGT400) 、QDR330(SGT700)、QD100、QD160
2、Case--Domestic

Installation and Commissioning of AGT-2 gas turbine at Xifeng Power Plant in Changqing Oilfield

Installation and commissioning of MS9001E gas turbine in Longwan,

Installation and commissioning of Clarion Centaur40 gas turbine in Tarim Oilfield

Installation and commissioning of Mars100 gas turbine in Xinjiang Lunnan Power Plant

SGT400 installation and commissioning in Guangzhou Aotou Distributed Energy Station

SGT300 installation and commissioning in Shanghai Dongguan Paper Co. Distributed Energy Station
3、Case--Oversea

Thyton Myanmar 6T.01 gas turbine power station installation and commissioning

Installation and commissioning of MS9001E gas turbine at SOYO power station in Angola

Installation and commissioning of PG9171E gas turbine at UCH power station in Pakistan
About | Product | Service | Advantages | News | Contact Us
ADD:17th Floor, Block H, Innovation World, No.109 Quanyun Road, Shenyang District, China (Liaoning) Free Trade Zone Tel:400-666-4828